SUMMIT PACKAGING
Warehouse Addition
ARCHITECT
CSD Engineering, Inc.
SELF-PERFORM
Concrete, Carpentry
LOCATION
Racine, Wisconsin
SIZE
77,000 square feet
PROJECT SCOPE
This project includes a 77,000-square-foot insulated pre-cast addition and site development for an existing plastics manufacturing facility. The expansion features a new heavy-duty asphalt parking lot with 72 stalls and two entrances from South Memorial Drive.
The facility includes multiple crane beams for five- and ten-ton cranes, a production area, a tool storage room, restrooms, locker rooms, an employee breakroom, mezzanine storage, and space for future offices. The addition also includes two 9’x10’ insulated overhead sectional dock doors.