top of page

WAUWATOSA SCHOOL DISTRICT 

Capital Improvement Projects, Renovations, Additions, & New Elementary Schools

MCKINLEY ELEMENTARY SCHOOL

The new elementary school includes a three-story classroom wing and a two-story wing with admin space, community room, music room, and a performance platform between the gym and commons space. The new building was constructed behind the current school and once finished, the old school was demolished and replaced with a playground.

LOCATION

Wauwatosa, Wisconsin

SIZE

77,522 square feet

SELF-PERFORM

Selective Demolition, Carpentry 

ARCHITECT

Plunkett Raysich Architects (PRA)

DELIVERY METHOD

Construction Manager, Prime

 AWARDS
  • Award of Excellence, IIDA Wisconsin, 2022

  • Gold Design Award - K-12 Category, ASID (American Society of Interior Designers) Wisconsin Chapter, 2022

 AWARDS
  • Award of Excellence, IIDA Wisconsin, 2022

  • Gold Design Award - K-12 Category ASID (American Society of Interior Designers) Wisconsin Chapter, 2022

UNDERWOOD ELEMENTARY SCHOOL

The new state-of-the-art elementary school was built while maintaining full operations of the existing school.  Scope included three stories of classrooms, an admin wing, gymnasium, purposeful areas, a music room, an outdoor classroom, and a performance platform. Upon completion, the old facility was razed and developed into parking.

SIZE

77,345 square feet

SELF-PERFORM

Concrete, Carpentry 

ARCHITECT

Plunkett Raysich Architects (PRA)

DELIVERY METHOD

Construction Manager, Prime

WILSON W/STEM ELEMENTARY SCHOOL

Renovation and a new addition to an existing elementary school. Phase 1 included renovations to the existing space and demolition of the existing outdated buildings. Phase 2 included new construction of a two-story, 56,000 square foot structure that adjoins the existing building. Civil, structural, HVAC, lighting, finish, and infrastructure upgrades were included.

LOCATION

Wauwatosa, Wisconsin

SIZE

81,435 square feet

SELF-PERFORM

Concrete, Carpentry 

ARCHITECT

Plunkett Raysich Architects (PRA)

DELIVERY METHOD

Construction Manager, Prime

LINCOLN ELEMENTARY SCHOOL

Renovation and a new addition to an existing elementary school. Phase 1 included mass demolition of roughly half of the existing building and construction of a new 53,000 square foot, three-story building that adjoins the existing school. Phase 2 included the renovation of the existing 28,000 square foot building to modernize space layouts, finish selections, and mechanical performance.

SIZE

81,000 square feet

SELF-PERFORM

Selective Demolition, Concrete, Carpentry 

ARCHITECT

Plunkett Raysich Architects (PRA)

DELIVERY METHOD

Construction Manager, Prime

 AWARDS
  • Bronze in Design Excellence for Educational K-12 Projects, ASID (American Society of Interior Designers) Wisconsin Chapter, 2021

  • Outstanding Project Award, Learning by Design, 2021

bottom of page