The existing facility remained fully operational during construction. There was regular communications between VJS and the owner on the schedule of what work was being performed. When it came time to cut the openings between the new and existing facility, a solid, dust proof enclosure was built on the existing side to ensure their current operations were not disrupted and no construction debris entered their facility. The temporary structure was taken down after the openings were complete and cleaned up.