New Berlin West Middle/High School | New Berlin, WI

OWNER IN CHARGE

New Berlin West Middle/High School 1
David Jorgensen
Executive Vice President
PROJECT DETAILS
  • Cost: $35,000,000
  • 114,538 square foot new gymnasium with four court basketball and running track, locker rooms, weight room, concession stand
  • Ten new tennis courts
  • 17,348 square foot circular idea lab for work group instruction, acclimating students to cubicle lifestyle in the workplace
  • 17,823 square feet of renovated library space and several adjoining classrooms, guidance area, computer data facility and cafeteria
  • State-of-the-art 750 seat auditorium and music facility
  • 240,000 square feet of updates including security, safety, ADA, mechanical, electrical, plumbing, building envelope and finishes
EXCEPTIONAL RESULTS

The storm sewer line was several hundred feet from the structure. We proposed constructing rain gardens for storm runoff and eliminating the need for new storm sewer lines. This saved over $100,000. In addition the solution was very popular with the City of New Berlin and has been used by the school as part of the environmental education.

New Berlin West High School was built on a site with extreme wetlands, navigable streams, and endangered species limitations. VJS met regularly with the DNR and the City of New Berlin to establish timeframes, design concepts, and implementation. Construction occurred during the most difficult time of the year and required VJS to work with all governing authorities to establish strategies that would not compromise any environmentally sensitive issues.

OWNER IN CHARGE

David Jorgensen
Executive Vice President

SIMILAR PROJECTS

New Berlin West Middle/High School 2
New Berlin West Middle/High School 3
New Berlin West Middle/High School 4
New Berlin West Middle/High School 5
New Berlin West Middle/High School 6