Braeger Ford | Milwaukee, WI
- Cost: $2,500,000
- 15,600 square foot addition
- 30,000 square foot renovation
- New showroom
- Car drop off
- Service bay
- Administrative offices
- Reception area
- Remodel of existing exterior facade
VJS was challenged by the owner to complete a design-build, 30,000 square foot renovation project in six months, exceeding previous expectations and reducing the budget by 15%. VJS was able to do an early stand on foundations to limit the winter conditions, and all the above ground building was completed. The final result was Ford Motor Company’s upper management team made an unscheduled trip to visit the dealership and see the finished building. They commented that the final product exceeded their Ford required standards and it raised the bar for other dealerships throughout the country.
SIMILAR PROJECTS
"When changes were made, the team was accommodating and always lent their perspectives on how things should be completed. As both of the manufacturers have been in to see the finished product, Ford and Chevrolet are both on the same page. These are the best facilities that they have ever seen."