Previous
Next

Bellevue Commons | Green Bay, WI

OWNER IN CHARGE

Bellevue Commons 1
Craig Jorgensen President
PROJECT DETAILS
  • Cost: $1,000,000
  • New 11,800 square foot ground up retail facility
  • Building was initially white boxed and tenant improvement work followed as space was leased
  • Prefabricated walls were utilized to negate winter conditions
EXCEPTIONAL RESULTS

At just under 12,000 square feet, this retail building is positioned on the main corner of a big box retail development. The original grade was within the 100 year flood plain so the site was built up four feet before construction could start. Aesthetically, the architectural design incorporates atrium spaces at the center and two anchor tenants. Current tenant include Starbucks, Cellcom, and Great Clips.

OWNER IN CHARGE

Craig Jorgensen
President

SIMILAR PROJECTS

Bellevue Commons 2
Bellevue Commons 3
Bellevue Commons 4
Bellevue Commons 5
Bellevue Commons 6
Bellevue Commons 7
Bellevue Commons 8
Bellevue Commons 9
Bellevue Commons 10